If it doesn t pull the drip edge out slightly from under the shingles.
Roof drip edge installation on existing roof.
Secure the drip edge with roofing cement.
Save yourself some.
How to install a drip edge.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
Three tips for overlapping drip edge flashing.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Tip 2 is.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Apply roofing cement when installing drip edge on an existing roof.
Place the metal roof drip edge flashing along the gable ends.
Once all the underlayment is applied go back and place.
Coat the flat part of the flashing that sits on the deck using a putty knife.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
Install roof drip edge along the eaves add underlayment then place drip.
Make sure the outer edge extends over the gutter.