0 5 g acceleration in a lateral direction.
Roof tie down requirements.
0 5 g acceleration in the rearward direction.
0 8 g deceleration in the forward direction.
Depending on the roof design and the roof rafter spacing.
These include the minimal nominal fixings for roof trusses where there is no net uplift.
Hvac hold down brackets are used to secure an hvac rooftop to a roof curb.
This section contains the following resource.
Longer screws may be required in n3 and n4 sites for some batten and rafter spacings.
Repairing storm damaged roofs tie down designs for tile and sheet roofs conforms to wind classifications of up to category n3 previously w41n designed to withstand a maximum gust wind speeds of 50 metres per second.
Batten fixings should comply with the tie down requirements specified in as 1684 2 fixings for 45mm deep timber battens should be 1 x 75mm long no.
Building codes such as the icc s 2012 international building code section 2308 10 roof and ceiling framing typically specify that where rafter ties are used they are required at intervals ranging from 12 to 24 o c.
14 type 17 screws for n1 and n2 site wind classifications.
Tie down details for repair of storm damaged roofs in south east queensland page 2 of 13.
This section contains the following resource.
Wind certification requires a professional engineer s pe stamp of approval to verify a hvac rooftop unit can safely withstand high wind gusts sustained winds or storms without separating from the roof curb or the roof curb separating from the roof.
Rafter or truss uplift connection forces from wind asd pounds per connection a b c d e f g h.
As 1684 2 clause 9 6 1 states that continuity of tie down shall be provided from the roof sheeting to the foundations.
The uplift connection forces are based on a maximum 33 foot mean roof height and wind exposure category b or c.
Anchor points are usually installed on the roof and are used to connect lanyards lifelines and other forms of tie off which prevent a worker from falling.
For pitched coupled roofs where there is net uplift that cannot be resisted by nominal nailing alone the code requires specific tie down fixings be installed.